location |
beijing, china |
completion |
2008 |
area |
2.500 m2 sales area, stage and TV station |
general contractor |
nüssli ag, switzerland |
client |
nüssli ag, switzerland |
design phases |
2 - 6 |
services |
architecture, building physics, fire protection |
|
|
|
|
|
following strict corporate identity guidelines, such as for the entrance elements, a pavilion was created that could accommodate strong design elements through a clear structural layout. a post-and-beam construction was chosen for the design. the approval planning was prepared to the point where the authorized partner in china could promptly submit the plans. special, country-specific construction characteristics were taken into account. sustainability was also integrated into the concept, as the pavilion was fully dismountable and reusable. |
|
|
|
|